5G | Technical Reports

BBF's 5G projects have resulted in the following 5G-related Technical Reports.

Resource no.
Resource type
Resource name
Project
Date
TR-493
  • Technical Report
TR-493: IMS for 5G-RG Architecture
2024/02
TR-494
  • Technical Report
TR-494: IMS for 5G-RG Residential Voice Requirements
2024/02
TR-458c1
  • Technical Report
TR-458c1: Wireless and Wireline Convergence with Control and User Plane Separation. Reference Architecture, Interface, and Protocol Specification
2024/02
TR-458
  • Technical Report
TR-458 Wireless and Wireline Convergence with Control and User Plane Separation. Reference Architecture, Interface, and Protocol Specification
2023/08
TR-456i2c1
  • Technical Report
TR-456 Issue 2 Corrigendum 1: AGF Functional Requirements
2023/07
TR-457
  • Technical Report
TR-457: FMIF Functional Requirements
2023/04
TR-521
  • Technical Report
TR-521: 5G Transport Networks
2022/06
TR-470i2
  • Technical Report
TR-470 Issue 2: 5G Wireless Wireline Convergence Architecture
2022/03
TR-456i2
  • Technical Report
TR-456 Issue 2: AGF Functional Requirements
2022/03
TR-456
  • Technical Report
TR-456: AGF Functional Requirements
2020/08
TR-470
  • Technical Report
TR-470: 5G Wireless Wireline Convergence Architecture
2020/08